    2009
  • January - Navajo Refinery, Artesia, NM - Inspection of a Rose Design, vertical cylindrical, gas fired, eight burner hot oil heater for OPF
    2008
  • January - Arabian BEMCO Contracting, Riyadh, Saudi Arabia - Troubleshoot two hot oil heaters with burner and PLC problems
  • March - Sunoco, Marcus Hook, PA - Inspect and advise the Owner of a reconstruction plan for an exploded gas fired process heater for Tulsa Heaters.
  • March - Ventura Refining and Transmission, Thomas, Ok. - Inspection of four relocated fired heaters for Plant Process Equip.
  • April - Arabian BEMCO, Riyadh, Saudi Arabia. - Remove and replace eight oil burner tiles, troubleshoot controls system.
  • August - Occidental Permian, near Post, TX - Inspect one fired heater and advise the Owner about replacing the convection section for OPF.
  • September - Enterprise Products near Meeker and Rio Blanco - Inspection of one (6) and one (12) burner hot oil heaters for OPF.
  • October - Ventura Refinery, Thomas, OK - Inspection of one platformer and three hot oil heaters for Plant Process Equipment.
  • October - Ergon Refinery, Vicksburg, MS - Inspection and field assembly of one six burner hot oil heater for InServ.
  • November - Questar Gas near Granger, WY - Inspection of one (12) burner cabin type hot oil heater for OPF.
  • December - Enterprise Products near Meeker and Rio Blanco - Startup and dryout of one (6), and one (12) burner hot oil heaters for OPF.
    2007
  • Jan/Feb - FCFC, Mai Liao, Taiwan - Continue fired heater dry-out program at Aroma-3 for Petro-Chem Development with over 350 burners
  • June - Enterprise Partners, # 1 Compressor Station near Meeker, CO - Pre-commissioning inspection of one, twelve burner Hot Oil Heater for OPF.
  • July - Frontier Refining, Cheyenne, WY - Startup and inspection of a new four burner vertical cylindrical heater for OPF.
  • July - Attend the Association of Reciprocal Safety Councils, Inc. safety training Basic Course and Vendor Specific courses in New Orleans, La.
  • July/August - Murphy Oil USA, Meraux, LA - Inspection and technical assistance on a damaged 72 burner, four cell platformer heater for PCD, Tulsa.
  • September - Ventura Refining and Transmission, Thomas, OK - Inspection of four relocated fired heaters to be refurbished for Plant Process Equip.
  • November - Pluspetrol, Malvinas Gas Plant, Camisea, Peru - Inspection of three vertical hot oil fired heaters, with six gas burners for Tulsa Heaters.
  • November - Williams Production, Parachute, CO - Assembly of one vertical hot oil heater with five gas burners for Optimized Process Furnaces.
    2006
  • January - BP/AMOCO, Lake Jackson, Texas - Trouble-shoot flame front generator ignition and recommend new replacement parts and upgrades.
  • March - Lidong Chemical Co., Qingdao, China - Inspect four fired process heaters total of 84 burners for Petro-Chem Development New York.
  • May - Koch Industries, Rotterdam, Holland - Inspect crude heater convection finned tubes for Tulsa Heaters Inc.
  • June/July - Fluor Chile SA, Lima, Peru - Steam Super Heater fired heater refractory installation supervisor for Petro-Chem Development New York.
  • September/October - Irving Oil Ltd., St. John, NB, Canada - Erection and startup of two new fired heaters for Petro-Chem Development, Tulsa, Ok.
  • November/December - Formosa Chemicals and Fibre Corp., Mai Liao, Taiwan - Startup SM-3 and Aroma-3 fired heaters for Petro-Chem Development
    2005
  • January - Chevron Phillips, Pasadena, Texas - Trouble shoot nuisance pilot thermocouple low temperature alarms and adjust FFG ignition settings.
  • April - Ultramar, Levis, Quebec - Attend heater erection kickoff meeting for Petro-Chem Development USA.
  • April - ENAP, Concon, Chile - trouble shoot nuisance flame scanner alarms and over firing condition on forced draft Acid Gas Incinerator for Zeeco.
  • May - Solvay Indupa Do Brasil, Santo Andre Brazil - Owner erection supervisor of EDC Cracking Furnace radiant and radiant coil for Petro-Chem USA.
  • June - Koch Industries, Rotterdam, Netherlands - Assist Owner with new convection revamp of large Crude Heater for Tulsa Heaters Inc.
  • July - Ultramar, Levis, Quebec - Attend heater erection kickoff meeting for Petro-Chem Development USA..
  • August - Suncor Energy, Commerce City, Colorado - Troubleshoot faulty flare flame front generator ignition and reset air/gas settings for Flaregas.
  • August - Ultramar Levis, Quebec - Final inspection of fired heater F-4502 for Petro-Chem Development USA.
  • September - Attended Process Fired Heater Seminar at Tulsa Heaters Inc., Tulsa, Oklahoma.
  • October - Attended Tennessee Valley Training Center safety training course # 20BOP and Premcor specific safety training in Memphis, Tn.
  • October - Phoenix Park Gas Processors Ltc., Port Lisas, Trinidad - Pre-commissioning inspection of Hot Oil Heater H-5501 for Tulsa Heaters Inc.
  • November - Solvay Indupa Do Brasil, Santo Andre, Brazil - Pre-commision, inspection and castable dryout of EDC Cracking Furnace for Petro-Chem.
    2004
  • February - MLNG, Bintulu, Sarawak, Malaysia - Trouble shoot and repair fired heater 1F-1301 nuisance pilot shutdowns for John Zink Australia.
  • March - Gunanusa Fabricators, Cilegon, Indonesia - Inspect and issue Certificate of Conformity for two offshore boom flares for Zeeco.
  • March - China Petroleum, Co. and Mitsuibishi Heavy Industries, Kaohsiung, Taiwan - Re-commission of two Brine Water Heaters for Zeeco.
  • May/June - JGC Philippines & Petron Limay, Bataan - Inspection pre-commissioning and dryout of new, fired heater F-2201 for Petro-Chem USA.
  • June 2004 - TotalFinaElf, offshore near Balikpapan, Borneo, Indonesia - Inspection, commissioning of SWP-E boom flare and startup of SWP-K for Zeeco.
  • October - Qatar Petroleum - Pre-commissioning inspection of two smokeless flares at Doha, Qatar for Flaregas Corporation.
  • November/December - Qatar Petroleum - Flare startup of one smokeless flare at Doha, Qatar for Flaregas Corporation.
    2003
  • January - Technip/CAPCO/AMOCO, Taichung, Taiwan - Process heater pre-commissioning, startup and dryout for Petro-Chem Development.
  • February - Gulf/Conoco/Phillips, Suban Gas Field, Indonesia - Inspection and startup of large multi tip burn pit flare for Zeeco.
  • February - PT Amoco Mitsui PTA Indonesia, Merak, Indonesia - Consult with the Owner concerning a fuel change for their fired heater for Zink.
  • March - Kinder Morgan, Snyder, Texas - Inspection and dryout of direct fired heater for Optimized Process Furnace.
  • April - Q-Chem/Phillips, Doha, Qatar - Troubleshoot flame noise of Polyethylene and Ethylene flares for John Zink Tulsa.
  • May - Callidus Technologies, Tulsa, Oklahoma - Flare and incinerator school.
  • May - Pemex, Madero, Mexico - Inspection and dryout of direct fired heater for Petro-Chem Development.
  • July/August/September - Chevron Oronite Pte. Ltd. Singapore - Commissioning and dryout of oil fired Hot Oil Heater U-9102.
  • October - MLNG, Bintulu, Sarawak, Malaysia - Trouble shoot and repair fired heater 1F-1301 nuisance pilot shutdowns for John Zink Australia.
    2002
  • January/February - Texaco/Kuwait Oil Company, Wafra, Kuwait - Site assembly, erection, startup and operator training of one high-pressure forced draft air assisted flare stack.
  • March 2002 - Petron Refinery, Bataan,Philippines - Pre-commissioning, startup, operator training of one oil fired air heater.
  • May - Kuwait Oil, Ahmadi, Kuwait - Pre-commission and startup three air assisted flares.
  • July - Koppers, Ind., Gary, Indiana - Relocate UV scanner and remove and replace pilot in Waste Gas Flare Combustor.
  • October - Callidus Technologies Thermal Oxidizer and Burner school at Tulsa, Oklahoma.
  • December 2002 - Gulf/Conoco/Phillips, Suban Gas Field, Indonesia - Pre-comm. of burn pit flare, FFG and pilot fuel system and operator training.
    2001
  • January and April - Abu Dhabi, UAE - Incinerator pre-commissioning inspection, and training of four classes of staff and operators.
  • February to May - Flexsys Malaysia - Sulfur Vaporizer heater pre-commissioning, training, inspection and Thermal Oxidizer castable inspection at Kuantan, Malaysia.
  • June - Abu Dhabi, UAE - Incinerator startup, castable dryout and operator training.
  • July to September - Indian Oil Corp., Haldia, India - Pre-commissioning of two Air Heaters, one CO Incinerator/Boiler, startups, castable dryout, temperature tests, operator training.
  • October - China Petroleum, Taoyuan, Taiwan - FCCU Plant Air Heater pre-commissioning inspection and operator training.
    2000
  • January to June - Mai Liao, Taiwan - at FPC drying out 15 heater items and operator training for Petro-Chem.
  • August - Baku, Azerbaijan - Startup and operator training of a Hot Oil Heater for Thermoflux, Inc.
  • September - John Zink Burner School at Tulsa, Oklahoma.
    1999
  • January to July - Assigned to Boustead International Heaters as Heater Specialist and fabrication surveillance in Paka, Malaysia. To witness the fabrication of a heater and piping for Esso -Thailand.
  • July and August - inspected one convection box during fabrication in Tulsa, Oklahoma, for Born Canada of Calgary, Alberta, Canada.
  • August and September - Offshore for Phillips China Inc. - inspecting two Therminol 55 fired heaters near Shekou - Shenzhen Province, China - Retrained the operators for platforms 30-2 and 24-3.
  • November and December - Mai Liao, Taiwan - Formosa Plastics drying out four SM-2 heater items for Petro-Chem.
    1998
  • January - Mai Liao, Taiwan - at Formosa Plastics Company, heater pre-commissioning inspections of 13 Born heater items for Petro-Chem Development.
  • February - Mai Liao, Taiwan - at FPC for Zeeco flare project as a Field Supervisor.
  • April 1998 - Reliance at Patalganga, India inspected a burner installation, did operator training and heater startup for Zeeco.
  • May 1998, to August - Mai Liao,Taiwan - at Formosa Plastics for Petro-Chem drying out 17 Aroma-1 and SM-1 heater items, operator training, and post dryout inspections.
  • September and October - Mai Liao, Taiwan - drying out three Born heaters for Nan-Ya Plastics.
  • October 1998 - Kaohsiung, Taiwan - at Grand Pacific Petrochemical doing pre-commissioning inspection of four heater items for Petro-Chem.